Video measuring instrument is about how to maintain the video measuring instrument. Video image measuring instrument is a precision measuring instrument integrating light, electricity and machinery. It needs good maintenance and maintenance to keep the instrument in good condition. Only in this way can the original accuracy of the instrument be maintained and the service life of the instrument can be prolonged. This article will introduce how to maintain the video image measuring instrument: 1. The two-dimensional imager should be placed at a room temperature of 20°C±5°C and a humidity of less than 60 In a clean and dry room, avoid surface contamination of optical components, rust of metal components, and dust and debris falling into the moving rails, which will affect the performance of the instrument. 2. After using the image measuring instrument, the work surface should be wiped at any time, preferably covered with a dust cover. 3. The transmission mechanism and the motion guide of the imager should be regularly lubricated to make the mechanism move smoothly and maintain a good working condition. 4. The glass and paint surface of the two-dimensional workbench is very dirty, you can wipe it with a neutral detergent and clean water. Do not use organic solvents to wipe the paint surface, otherwise the paint surface will lose its luster. 5. The LED light source of the auxiliary image measuring instrument has a long service life, but when the bulb burns out, please notify the manufacturer, and the professional will replace it for you. 6. The precise components of the image measuring instrument, such as the image system, worktable, optical ruler and Z-axis transmission mechanism, need to be fine-tuned. All adjusting screws and fastening screws have been fixed, the customer should not disassemble it by himself, and notify the manufacturer to solve it. 7. The two-dimensional software has accurately compensated the error between the workbench and the optical ruler, please do not change it by yourself, otherwise, wrong measurement results will be produced.
8. Do not unplug all the electrical connectors of the 2D imager. If you unplug the plug, you must correctly insert and tighten it according to the markings. Incorrect connection may at least affect the function of the image measuring instrument, or worse The situation may damage the system.
Tel: 0086-0769-2318 4144
Mobile: 0086-137 2828 8444
Telephone: 0086-0769-23184144
E-Mail: mz@sinowon.com
Website: www.sinowon.com
Headquarter Address:
C1-508, Tian'an Cyber Park, #1 Glod Road, Nancheng, Dongguan, China (Post Code:523080)
Factory:
Unit 01, Building 7, No. 120, Liantang Road, Tangxia Town, Pengjiang District, Jiangmen, Guangdong, China (Post Code:529000)
International Trade Sector:
C1-501, Tianan, Gloden Road, Nancheng, Dongguan, Guangdong, China(Post Code:523080)
Copyright © 2025 Sinowon | All Rights Reserved.